Success Story

Client:500 Sansome LLC

Location: San Francisco, CA

Project Type: Multi-Story Commercial

Challenges

  • 9 story commercial building in downtown San Francisco
  • Existing Tar & Gravel roof exceeded its life expectancy
  • 6 ½’ tall walls around perimeter of roof
  • Abandoned heavy equipment on roof top
  • Create a roof system with warranty to meet wind uplift criteria
  • Getting material on the roof and waste off the roof
  • Limited ground staging

Get Adobe Flash player

Dinyari Solutions

  • Removal of existing Tar & Gravel roof down to concrete deck
  • Overlay concrete deck with one layer of 6-mil thick vapor barrier
  • Overlay the vapor barrier with one layer of 3/8” thick EPS
  • Fully adhere 72-mil TPO white thermoplastic membrane over the field
  • Remove water tanks and cut back waterlines
  • Remove water tank concrete platforms and other misc equipment on roof

Successes

  • Removal of over X tons of material off roof
  • Coordination with crane and debris removal companies
  • Installation of new Carlisle 72-mil TPO membrane with 20-Year NDL Labor and Material Warranty
  • New Carlisle TPO helps to reduces heat island effect within San Francisco
  • Daily building operations were not interrupted
  • Entire project completed on time and on budget

 

Customer Review

Learn what our customers say
about our services. Read more »

Watch a Dinyari Roof Installation

CeramaFlex Fluid Applied Roofing System

Carlisle TPO Fleeceback Roofing System

Project Spotlight

Jameco Electronics, Belmont, CA. 30 year old Tar & Gravel Roof. After new cool roof installation, it helps reduce the entire building......read more