HighRise

500 Sansome LLC

Challenges:

  • 9 story commercial building in downtown San Francisco
  • Existing Tar & Gravel roof exceeded its life expectancy
  • 6 ½’ tall walls around perimeter of roof
  • Abandoned heavy equipment on roof top
  • Create a roof system with warranty to meet wind uplift criteria
  • Getting material on the roof and waste off the roof
  • Limited ground staging

 

Read more about Dinyari solutions and success story


 

The Marc

Challenges

  • Occupied 11 story apartment building
  • Existing built up roof with aluminum coating had exceeded its life expectancy
  • Building height and wind speeds
  • Safety on roof
  • Loading material on and off the roof

 

Read more about Dinyari solutions and success story


 

Stanford

Challenges

  • Occupied 12 story residential student housing
  • Crowded roof top with little open field
  • Loading material on and off the roof
  • Existing Tar & Gravel roof had exceeded its life expectancy
  • Poor drainage

 

Read more about Dinyari solutions and success story


 

Customer Review

Learn what our customers say
about our services. Read more »

Watch a Dinyari Roof Installation

CeramaFlex Fluid Applied Roofing System

Carlisle TPO Fleeceback Roofing System

Project Spotlight

Jameco Electronics, Belmont, CA. 30 year old Tar & Gravel Roof. After new cool roof installation, it helps reduce the entire building......read more